CallGet a free quote
Case study · Commercial · First-fix

Cable Containment, Set Out Right.

Commercial unit · Tray, trunking & conduit · First-fix

The hidden work, done right. Cable tray, trunking and conduit set out properly at first-fix, planned, level and square, so the rest of the installation runs clean and the trades after us inherit a job, not a problem.

Galvanised cable tray and containment installed level and square by FRM across a steel-frame ceiling at first-fix.Fig. 01 · Set out on site
600 mTray, trunking & conduit
4Containment routes
100%Set out to spec
2 wksFirst-fix on site
Sector
Commercial / industrial unit
Location
South Yorkshire
Scope
Containment & first-fix
Stage
First-fix
Why it matters

First-Fix Is the Part Nobody Sees, and the Part the Whole Install Rests On

Get the containment right and everything after it is safer, quicker and easier to certify. Rushed or improvised, it costs you at every stage that follows.

Safe & Maintainable

Cables properly carried and reachable for the life of the building, not just on handover day.

Compliant by Design

Segregation, support and routing set out to BS7671 and good industry practice from the very start.

A Smoother Second-Fix

When the containment is right, every trade after it, ours included, works faster and cleaner.

The Mark of a Serious Contractor

Tidy, geometric first-fix is what main contractors look for. It's quality you can see before a cable's pulled.

Our approach

How We Set It Out

The same discipline on every run, so what goes up is planned, neat and right the first time.

Set out to

BS7671 & good industry practice: correct support intervals, segregation and routing, coordinated with the other trades.

  1. 01

    Planned, Not Improvised

    Routes set out and agreed before a length of tray goes up.

  2. 02

    Neat, Level and Square

    Runs that look as good as they perform: consistent throughout.

  3. 03

    Properly Supported

    Spaced and fixed to carry the load for the life of the building.

  4. 04

    Correctly Segregated

    Power, data and services kept apart and to spec.

  5. 05

    Built for Access

    Room to pull cables now, and to add to the runs later.

  6. 06

    Coordinated on Site

    Sequenced with the other trades so first-fix doesn't clash.

The result

Handed to Second-Fix Clean

A tidy, geometric, compliant first-fix: every run squared off, supported and segregated, ready for cables to be pulled and the next trades to get on without untangling someone else’s mess.

Tidy & geometric
Runs squared off and consistent
Segregated to spec
Power and data kept properly apart
Ready for second-fix
A clean handover to the trades after
One of the cleanest first-fixes we’ve followed on: every run squared off and consistent. It made our second-fix straightforward.
Site manager, principal contractor
More work

Related Projects

A modern commercial office fit-out by FRM with exposed services, containment and feature lighting.3
Commercial

Commercial Office Fit-Out

Power, data and feature lighting for a modern office fit-out, delivered to programme.

High-bay LED lighting and power installed by FRM throughout a large industrial unit.4
Industrial

Industrial Unit: Lighting & Power

A full relight and power install in a large unit: high-bay LED throughout.

Need First-Fix Done Properly? Get a Free Quote.